How long a bathroom takes

Day by day, from the strip-out to the last bead of silicone, and the wait before day one.

Get a free quote

Free, no obligation. One local company prices it, not five.

  • 7 to 12 daysfor a standard bathroom
  • About a weeka small refresh
  • 10 to 14 daysa wet room
  • 1 to 2 weeksfor tiles that have to be ordered in
A gloved hand setting levelling clips between large floor tiles

How long a bathroom takes: the short answer

A standard bathroom renovation in Ireland takes 7 to 12 working days from the strip-out to the final clean. Wet rooms take longer, because the floor has to be laid to a fall and the tanking left to cure.

The stages, in order

StageDays
Strip-out and skip1
Plumbing first fix1 to 2
Boarding and tanking, then drying1 to 2
Tiling2 to 3
Second fix and finishing2 to 3
Total, working days7 to 12

Tanking and screed have to dry before tiling. That's where days slip.

The weeks before it starts

  • Pick and order the tiles and the suite first. Tiles that have to be ordered in can take one to two weeks.
  • A made-to-measure shower screen or vanity can take longer. Order it at the start.
  • A grant job waits for the council's approval before anything starts.

Living with one bathroom

The room is out of use for the whole job. Ask whether the toilet can go back in at the end of each day, and for how many days there'll be no shower.

Get a price for your bathroom in 4 taps

Tap what you need and leave your number. It goes to one vetted bathroom remodeling company covering your county, and they ring you back to see the room and give you a written price.

What's the job?

Pick the closest. They'll ask the rest.

By sending, you agree to Bathroom Remodeling passing your details to one vetted bathroom remodeling company covering your county, so they can contact you about the job. Privacy notice

Questions people ask us

How long does a bathroom renovation take in Ireland?

7 to 12 working days for a standard bathroom.

How long does the tiling take?

Two to three days in a standard bathroom, after the tanking has dried.

What makes it take longer?

Moving the toilet or shower, a wet room floor, drying times, and tiles or a vanity that haven't arrived.

Can I use the bathroom during the work?

No. It's out of use for the whole job. If it's your only one, ask how the toilet will work overnight and plan showers elsewhere.

Get a free price for your bathroom in Ireland

Four taps, or a photo. One local company rings you with a written price.

Get a free quote

Every guide, calculator and county page

Jump straight to any specification guide, our interactive calculator, the technical glossary or your county page.

Step 1 of 3